This week the construction site is very active at moving the top soil around the building site.

More pile of top soil being moved to areas around the site to be spread at a later date.

Roadwork and preparing the driveway and parking lots of the new site.

The foundation is being poured at the front of the building. The footings are being prepared for the walls to be set and poured. In the distance you can see the entrance to the third and fourth grade wing.